Elecosoft Asta Powerproject
4D construction scheduling and risk analysis platform for schedule-driven project delivery; competitor to Bentley Synchro.
Visit Elecosoft Asta Powerproject →Hidden PricingAgent-hostile
2.4/5composite score
Value for the price 2/5 reflects quote-only enterprise pricing (red flag: pricing wall); Agent Friendliness 2/5 reflects no documented API or CLI (red flag: agent-hostile); Ease of adoption 3/5 reflects self-serve desktop installation with 14-day trial; Portability & lock-in 3/5 reflects standard export (XLS, CSV, PDF); Interoperability 2/5 reflects limited CAD integrations via companion products (Siteprogress, Vision). LSE-listed company, 9-time UK Construction Computing Award winner.
Situational
Rubric Scorecard
| Criterion | Score | Evidence |
|---|---|---|
| Value for the price | 2/5 | HybridSource → |
| Agent Friendliness | 2/5 | -- |
| Ease of adoption | 3/5 | -- |
| Portability & lock-in | 3/5 | 3 file formats |
| Interoperability | 2/5 | 2 integrations |
Pricing
ModelHybrid
Free tierno
Trialyes
Published by buildingtech.pro. How we verified this: we checked Elecosoft Asta Powerproject against its live site and an independent source — getapp.com. Nothing on this page is listed from memory. See how we grade. Verified 2026-09-02.
Evidence
File formats
| Format | Direction | Support |
|---|---|---|
| XLS | both | full |
| CSV | export | full |
| export | full |
Integrations
Asta SiteprogressAsta Vision
Sources
Alternatives in Construction Scheduling
4D BIM construction scheduling platform (SYNCHRO 4D + Perform) that links Primavera or MSP activities to 3D model objects for digital construction delivery.
4.6/5
Lean-construction scheduling platform combining Master Schedule (CPM-style contract scheduling), Lookahead Planning, Weekly Work Plans (pull-planning/Last Planner-style commitments), and Roadblocks/constraint tracking, with two-way Primavera P6 and MS Project import/export and native Procore and Autodesk integrations.
3.8/5
Predictive project delivery platform using AI for infrastructure schedule estimation, timeline prediction, and risk forecasting. Clients include Google, Turner Construction, CBRE. London-based. Series A: $25M (Macquarie Capital).
3.6/5
Digital last-planner system for collaborative pull planning, PPC tracking, and constraint management.
3.4/5
See all Elecosoft Asta Powerproject alternatives → ยท Compare all Construction Scheduling tools →
Subscribe to Building Tech Pro
A free weekly briefing on AEC software news, including Construction Scheduling tools, every item sourced and linked to the catalog.
Subscribe free on Substack →